Barminco at our best

with the Nova Project

The Nova Project is an exciting new Nickel and Copper deposit

under development in the largely unexplored Fraser Range, with

access being gained via the Eyre Highway.

Located in the remote Fraser Range, approximately 120km east

of Norseman and 220km south west of Kalgoorlie, the project is

set to have a mine life of 10+ years.

Our client, Independence Group NL (IGO), and prior to that Sirius

Resources, has engaged Barminco to develop the underground

mine and undertake all production activities underground.

Under the leadership of Project Managers Aaron Rankine and

Percy Porter, there are 27 Barminco personnel on site and

we’re pleased to report that there have been no reportable

injuries on the project to date. In fact, September was 254

days TRI free! This is reflective of Barminco’s commitment to

excellence in safety.

High speed development has been an outstanding result for the

project from commencement. The past 3 months alone has

averaged 341 development metres in a single heading operation.

Barminco is very proud of its workforce at Nova, who through

their safety performance and dedication have achieved this

envious target for others to follow.

Did you know?

• The Ngadju People are the traditional owners of the land.

• Power for the site is generated on-site by a 16 megawatt

predominantly diesel-fire power station with solar substitution.

• The processing plant will consist of conventional crushing,

grinding by open circuit SAG mill followed by a ball mill in

closed circuit, and sulphide flotation to produce separate

copper and nickel concentrates.

Fast Fact

• The Ore Reserve estimate comprises 13.1Mt grading 2.1%

nickel, 0.9% copper and 0.07% cobalt for a contained

273,000t of nickel, 112,000t of copper and 9,000t of cobalt.

Barminco - facing

challenges head on,

and succeeding!

Barminco works on projects all around the world and in some

of the most remote and challenging locations possible – just like

our Sukari Hills project, which is located 700 kilometres south

of Cairo and 25 kilometres from Marsa Alam on the Red Sea.

Working for our client Centamin, Barminco is the only

underground contractor at Sukari and is responsible for all

development, stopping, load haul operations, air leg rising and

diamond drilling work on site.

The large-scale open pit and underground gold mine consists

of two declines, access and ore drives and the current targets

are for 700 metres development and the production of 90,000

tonnes of ore each month – quite a challenge!

Under the leadership of Paul Landers, Jordan Paterson and

Rhys Harvey, there are 75 expats involved with the project, in

addition to 150 nationals.

Significantly, Barminco has been tasked with training the

national workforce and there are now a number of underground

roles being carried out by Egyptian workers. To facilitate this,

toolbox meetings are translated from English to Arabic so all

personnel understand instructions for the day and we also have

radio controllers translating to the operators underground.

The workforce reside in rented apartments in Marsa Alam, with

expats working 6/3 rosters and the national workforce working

20 days on and 10 days off.